Headder Logo
Page image

Map Timescale Information

Knowledge timescales show when knowledge is required over the lifetime of a project. The main map reflects the knowledge needed during the project and the timescales show when knowledge areas and items are required during the project.

The total knowledge needed requirement for this study has been set from January 2000 to February 2020.

Time maps are available to show how the knowledge requirement changes as the project develops. The first time map leads to the rest of the knowledge change point maps.

More information about how the knowledge requirement changes throughout the life of the project can be seen here.

Chart showing when knowledge is needed:

Bar charts showing when each item of knowledge is needed with respect to the overall project duration. Note, blue bars indicate that the timeframes for that knowledge node have not been set and the knowledge is assumed to be needed throughout the project. A yellow highlight shows which node was highlighted when the web site was exported.

Map time chart Map time chart Map time chart
footer image