Know how to create a technical drawing that will show the necessary elements of a job and enable engineers reading the drawing to complete the job correctly.
This knowledge element has a risk value of 3.34, whilst the average risk for the whole knowledge structure is 4.452. Consult the RISK page for more details.
The average risk of the prerequisite family of this knowledge node is 1.312 (adjusting for nodes with few members of the prerequisite family).
The average normalised prerequisite family risk of the whole map 1.992, whilst the average for the top ten percent family risk is 4.712.
The learn time for this node given an understanding of the prerequisites, is about 1 week. The estimated learn time for the entire knowledge structure of this node is about 1 month.
The person based risk associated with create Basic technical drawing is 0.6. This value is high and the situation should be looked at.