Know how to carry out a site survey that will ensure that installation runs smoothly and delays are not introduced.
This knowledge element has a risk value of 6.39, whilst the average risk for the whole knowledge structure is 4.452. Consult the RISK page for more details.
This knowledge is one of the higher risk items in the knowledge structure. Its risk value of 6.39, can be compared with the average risk for the highest ten percent of the knowledge, of 6.362 and the average risk for the whole map stated above.
The average risk of the prerequisite family of this knowledge node is 4.472 (adjusting for nodes with few members of the prerequisite family).
This figure for the average risk of the prerequisite family is in the top ten percent of high risk for this knowledge study.
The average normalised prerequisite family risk of the whole map 1.992, whilst the average for the top ten percent family risk is 4.712.
The learn time for this node given an understanding of the prerequisites, is about 3 months. The estimated learn time for the entire knowledge structure of this node is about 2 years.
This knowledge node has reached a high risk trigger point for the parameters 'StaffAvailable' and 'Importance'.
See the parameters page for information about trigger point settings.
The person based risk associated with Site survey is 0.6. This value is high and the situation should be looked at.