Understand the general construction of a PC and the main sub components.
This knowledge element has a risk value of 3.3, whilst the average risk for the whole knowledge structure is 4.452. Consult the RISK page for more details.
The learn time for this node is about 2 weeks. This is based on a typical knowledge entry level to this knowledge area.
The person based risk associated with Basic PC architecture is 0.69. This value is high and the situation should be looked at.