Know how to prepare tools, equipment and materials so that they will all behave as expected when needed.
This knowledge element has a risk value of 4.0, whilst the average risk for the whole knowledge structure is 4.452. Consult the RISK page for more details.
The learn time for this node is 2 days. This is based on a typical knowledge entry level to this knowledge area.
The person based risk associated with Equipment and Materials preparation is 0.66. This value is high and the situation should be looked at.