Headder Logo
Page image

Equipment and Materials preparation

Know how to prepare tools, equipment and materials so that they will all behave as expected when needed.

Knowledge Node Risk

This knowledge element has a risk value of 4.0, whilst the average risk for the whole knowledge structure is 4.452. Consult the RISK page for more details.

Learning Time Information.

The learn time for this node is 2 days. This is based on a typical knowledge entry level to this knowledge area.

People risk information.

The person based risk associated with Equipment and Materials preparation is 0.66. This value is high and the situation should be looked at.

footer image